Reviews

0/10

The workmanship on the kitchen was "rough" with our new cabinetry being cut without our consent to slip in the tiles rather than cutting the tiles to fix. The hardwood floor have to redone again after we pointed our the nail holes were not filled all along the walls, scratched from the polisher evidenced, and our newly painted walls marked from the equipments and deep marks on our kitchen tiles from the hardwood floor equipments just dropped on carelessly on it. CDL solution is not to charge us for the transition strips (3 of them) & that our house was under construction so things like that happens. In other word, they are NOT responsible. We were living in the basement during the renovation, so I gave them the heat, under construction means no one living in the house, & even if it was under construction, they are paid to make sure installation is done properly and to their proposed standard. The hardwood guys even poured their chemical down our brand new sink coating it with the sealant used. There was no supervision on any of CDL work done, it was left to whoever they sub-contracted to. If there are problems, CDL was quick to point the fingers. So beware. The only thing good that came out of this renovation is an excellent tile work on our backsplash & bathroom. There was also too much tiles ordered based on CDL measurement but they took them back to avoid further dispute with us, citing they were short of that particular tiles for another project. Even the final billing was calculated wrong!! Be prepare for a lot of grief when using this company unless you are doing the work yourself or have your own contractors. Not recommended for anyone who has not renovated before.

Approximate cost of services:
$8,000.00
1 of 1 people found this review helpful.
Was this review helpful?