Garage floor was poured on a Friday; the concrete guy said I should wait a week before allowing the asphalt guys to do the driveway. Also suggested I should get the front walkway (interlock) remediated to line up with the new surfaces, BEFORE the asphalt.
So I had to find a contractor in a hurry, to do a small repair job in the middle of the busy summer season. Without a lot of hope I posted the project on HomeStars on the Saturday; within an hour Lt Integrity responded and was there within another hour with a quote to do the work the following week. I accepted the quote on Sunday.
Monday morning they were there at 7:00 am, dismantling about 150 sq ft of existing interlock. They carefully re-levelled with polymer sand, sloping away from the house and towards the driveway. Compacted thoroughly, relaid the interlock and compacted with more polymer sand. Cleaned up, wetted and gone by 10:30.
The finished result looks great and you can tell the work was done professionally and with care.
This contractor exceeded my expectations for responsiveness and speed; I would recommend them for any similar work.