Reviews

9/10

We had the master bathroom complete gutted and redone. The flooring in the bedroom was replaced and repair done to the flooring in the adjoining hallway. Muhammed was very helpful in helping us choose the design and materials. He gave us a reasonable quote and was very transparent with any additional costs. The work took a little longer than anticipated (3 weeks) due to getting licensed plumber to work in a condo setting and rescheduling work for final touch ups.. There was some minor touch up needed at the end. Muhammad came back to complete these. Overall the work looks very professional, especially the tile work. Throughout the renovations Muhammad made sure that we were satisfied with the product chosen and always gave us an option to upgrade if we wanted.

Approximate cost of services:
$13,000.00
Was this review helpful?