Bathroom renovation
Picked this contractor through referral process. Requested quote after numerous others stipulating specific timeline for work completion as well as specific breakdown of allocated costs. Completion of work took three months longer then the anticipated 3 week time frame quoted as well as final cost was considerably higher based on add-ons and changes that were not fully discussed/disclosed during the Reno process. Overall the end result is a bathroom that looks professionally done, minus a couple electrical issues that needed to be addressed. I would recommend this contractor for the work done as quality workmanship was provided however the only issues that were a concern to me are the timeframe of work completion quoted as opposed to the actual time taken to complete as well as not fully being aware of the costs before they were incurred.